D10.2 First draft of the Exploitation Plan (CO)

Publishable Summary: This deliverable aimed to present the results of the exploitation plan and the intellectual property protection (IPR) strategy of the technologies and solutions that will be implemented by three ‘lighthouse’ and three ‘follower’ demo cases engaged in the development of industrial symbiosis within the CORALIS project. The deliverable identifies and describes, with respect

The post D10.2 First draft of the Exploitation Plan (CO) appeared first on Coralis.

D10.1 Market analysis results for replication (PU)

D10.1 Market analysis results for replication (PU)

Publishable Summary: This deliverable aimed to present the results of the market analysis of the technologies and solutions that will be implemented by three ‘lighthouse’ and three ‘follower’ demo cases engaged in the development of industrial symbiosis within the CORALIS project. The deliverable identifies and describes, with respect to the various technologies and solutions identified

The post D10.1 Market analysis results for replication (PU) appeared first on Coralis.

D9.2 Follow-up report of CORALIS demonstration sites (CO)

Publishable summary: Industrial symbiosis (IS) solutions usually involve the transfer of any form of waste material and/or energy flows between stakeholders for valorisation and environmental impact reduction purposes. The success of the transaction may be influenced by several aspects, i.e., matching between offer and demand in terms of flow quality and amount, technical viability of

The post D9.2 Follow-up report of CORALIS demonstration sites (CO) appeared first on Coralis.

D10.1 Market analysis results for replication (PU)

D11.6 Mid-term report on communication and dissemination activities (PU)

Publishable summary: This deliverable presents the Mid-term report on communication and dissemination activities for CORALIS, describing the implementation of the Communication and Dissemination (C&D) Plan, which has guided the consortium’s communication and dissemination activities in the first 2 years of the project so far and which will be carried out during the rest of the

The post D11.6 Mid-term report on communication and dissemination activities (PU) appeared first on Coralis.

D10.1 Market analysis results for replication (PU)

D8.4 Engagement activities in the CORALIS follower cases to promote participatory processes in the definition of each IS follower case (PU)

Introduction and objectives: The pursuit of sustainable and circular solutions has become increasingly vital in today’s rapidly evolving world. Industrial symbiosis, a concept that fosters the collaboration and exchange of resources between industries, offers a promising pathway towards a more sustainable future. It seeks to transform the traditional linear economy into a circular economy, where

The post D8.4 Engagement activities in the CORALIS follower cases to promote participatory processes in the definition of each IS follower case (PU) appeared first on Coralis.

D8.3 Feasibility analysis for the valorisation of spent caustic (CO)

Publishable Summary: This deliverable aims to present the findings of the efforts for the feasibility studies for valorisation of spent caustic. Information related to the results from literature research, detailed characterization of spent caustic, the findings from the focus group meetings and the “Regional Industrial Symbiosis Vision Workshop” can be found in the relevant sections

The post D8.3 Feasibility analysis for the valorisation of spent caustic (CO) appeared first on Coralis.

D5.5 IS solution implemented in the QSr process (CO)

Publishable summary: This report focuses on the installation and construction of an innovative process for the production of KNO3 in a very integrated IS environment. The works referred to in this deliverable have been carried out after the design and engineering of the KNO3 Demo Plant at QSr site in Escomberas (Cartagena, Spain). This process

The post D5.5 IS solution implemented in the QSr process (CO) appeared first on Coralis.

D7.4 Commissioning of all the equipment and pilot plants (CO)

Introduction: The aim of this report is to demonstrate, in a schematic description, the installation of the new plants required for the recovery and valorisation of industrial materials involved industrial sites since it is a demonstrator deliverable. In details: – Torbole has installed the treatment line to separate the silica from metal powders and has

The post D7.4 Commissioning of all the equipment and pilot plants (CO) appeared first on Coralis.

D8.1 Technoeconomic analysis and business model of an energy recovery system in Basauri (CO)

Publishable summary: As recommendation, include an abstract of the main activities and objective results of the DLV considering the scope of the DLV and the project objectives. If suitable, include the most relevant and descriptive diagrams used in the DLV. This Publishable Summary will cover the objective of the deliverable, methodology used and results obtained,

The post D8.1 Technoeconomic analysis and business model of an energy recovery system in Basauri (CO) appeared first on Coralis.

D7.3: Design and Engineering of all equipment and pilot plants (CO)

Introduction: In the Brescia demo-case, the main objective is to implement technologies for industrial waste treatment waste valorisation and landfill prevention. This will be applied in a total of 4 metal production factories for the establishment of a collaborative scheme. The aim of this report is to provide a schematic description of the activities done